Last week we had a transformer melt and lost power throughout most of the
building.  As good luck would have it, the MoFlo and other cytometer were
both off, but neither are on a emergency power circuit.  I am wondering what
kinds of protective measures other people have in place for dealing with
spikes, mini surges, and catastrophic power loss.  I know that even if the
equipment were on emergency back-up, there would be a 'Bump', during the
momentary delay while the generators started.

Thanks,

Howard