Lab Layout


RELATED PAGES:
Optics | Fluidics | Electronics | Software | Performance
Safety | Accessories | Facility Requirements | Lab Layout

    UTILITY LIST (Drawing depicts connections NEEDED -- actual placement in room may vary per customer requirements/preference

1. NETWORK CONNECTION for COMPUTER WORKSTATION

2. 110v, 3A POWER to COMPUTER WORKSTATION

3. POWER to laser 1 pwr sply (located under bench)

4. WATER to Laser 1 (from HOUSE or Heat Exchanger)

5. WATER from Laser 1 (to HOUSE or Heat Exchanger)

6. POWER to Laser 2 pwr sply (located under bench)

7. WATER to Laser 2 (from HOUSE or Heat Exchanger)

8. WATER from Laser 2 (to HOUSE or Heat Exchanger)

9. 110V, 12A POWER to BENCH POSER STRIP 10. POWER to air-cooled Laser 3 pwr sply (located under bench)

11. 115V, 6A POWER to Jun-Air compressor

12. 110V, POWER to Gast vacuum pump

13. 110V, 3A POWER to ELECTRONICS RACK

14. 110V, 5A POWER to LP-5 heat exchanger

15. WATER to Coherent Enterprise Laser

16. WATER from Coherent Enterprise Laser

17. 208V, 10A POWER to LP-20/40/60 heat exchanger

18. WATER to Laser(s)

19. WATER from Laser(s)

20. HOUSE WATER to LP-20/40/60 heat exchanger(s)

21. 220V, POWER to transformer

22. 110V, POWER from t-former to bench power strip

23. 110V, POWER from t-former to electronics rack

For more information about our products, please contact Cytomation at information@cytomation.com.

RELATED PAGES:
Optics | Fluidics | Electronics | Software | Performance
Safety | Accessories | Facility Requirements | Lab Layout