|
RELATED PAGES: |
Optics | Fluidics | Electronics | Software | Performance |
Safety | Accessories | Facility Requirements | Lab Layout |
    | UTILITY LIST (Drawing depicts connections NEEDED -- actual placement in room may vary per customer requirements/preference 1. NETWORK CONNECTION for COMPUTER WORKSTATION 2. 110v, 3A POWER to COMPUTER WORKSTATION 3. POWER to laser 1 pwr sply (located under bench) 4. WATER to Laser 1 (from HOUSE or Heat Exchanger) 5. WATER from Laser 1 (to HOUSE or Heat Exchanger) 6. POWER to Laser 2 pwr sply (located under bench) 7. WATER to Laser 2 (from HOUSE or Heat Exchanger) 8. WATER from Laser 2 (to HOUSE or Heat Exchanger) 9. 110V, 12A POWER to BENCH POSER STRIP 10. POWER to air-cooled Laser 3 pwr sply (located under bench) 11. 115V, 6A POWER to Jun-Air compressor 12. 110V, POWER to Gast vacuum pump 13. 110V, 3A POWER to ELECTRONICS RACK 14. 110V, 5A POWER to LP-5 heat exchanger 15. WATER to Coherent Enterprise Laser 16. WATER from Coherent Enterprise Laser 17. 208V, 10A POWER to LP-20/40/60 heat exchanger 18. WATER to Laser(s) 19. WATER from Laser(s) 20. HOUSE WATER to LP-20/40/60 heat exchanger(s) 21. 220V, POWER to transformer 22. 110V, POWER from t-former to bench power strip 23. 110V, POWER from t-former to electronics rack
For more information about our products, please contact Cytomation at information@cytomation.com.
|
RELATED PAGES: |
Optics | Fluidics | Electronics | Software | Performance |
Safety | Accessories | Facility Requirements | Lab Layout |